Tarwin Street Wetlands Stage 2 and 3

Ace Earthmoving was contracted by Baw Baw Shire Council to construct Stage 2 and 3 of Tarwin Street Wetland to treat stormwater from a Waterford Rise.
The project consisted of:
Stripping off 150mm Toposil from 30,423m2Excavation of 38,043 cubic metres of material and disposal off siteConstruction of 2 Porous Rock WiersSupply and installation of 82m of 225 diameter reinforced concrete pipe Excavation and supply of geofabric and 300-600mm rock beaching to new 1200m2 creek alignmentAll landscaping of Stage 2 and 3 of the wetlandsTopsoiling of 30,423m2 with 150mm of topsoil and establish grass cover
P.O. Box 709 Morwell 3840, VIC, Australia
Phone: (03) 5134 8692
HomePAST PROJECTSwhy usContact
Copyright © All rights reserved.

We use cookies to enable essential functionality on our website, and analyze website traffic. By clicking Accept you consent to our use of cookies. Read about how we use cookies.

Your Cookie Settings

We use cookies to enable essential functionality on our website, and analyze website traffic. Read about how we use cookies.

Cookie Categories
Essential

These cookies are strictly necessary to provide you with services available through our websites. You cannot refuse these cookies without impacting how our websites function. You can block or delete them by changing your browser settings, as described under the heading "Managing cookies" in the Privacy and Cookies Policy.

Analytics

These cookies collect information that is used in aggregate form to help us understand how our websites are being used or how effective our marketing campaigns are.