Past Projects

Moe Walhalla Road - Drainage Augmentation
Ace Earthmoving was contracted by Latrobe City Council to upgrade the existing drainge infrastructure at the Moe - Walhalla Road outfall


The project consisted of the installation and construction of 

160m of 1200mm diameter reinforced concrete pipe
320m of 450mm diameter reinforced concrete pipe
60m of 300mm diameter reinforced concrete pipe
5 twin 1200mm reinforced concrete headwalls 
10 1000x750 grated junction pits
1 3600x1500 grated junction pit


image-523028-20151020_102609.jpg?1445389025518



Newman Park Carpark, Traralgon
Ace Earthmoving was contracted by Latrobe City Council to construct a new off steet carpark in Newman Park Traralgon.

The new 56 bay asphalt carpark consisted of:

Excavation of the existing site to the new design levels
Installation of 101m of 300 diameter reinforced concrete pipe
Construction of a rain garden to manage surface runoff
Construction of 5 1000 x 750 new drainage pits
Construction of crushed rock pavement 
Application of 7mm emulsion seal
Application of 30mm of 10mm type H asphalt
Application of linemarking 
image-524279-20151022_143126.jpg?1445550967878


Chapel Street Carpark, Morwell
Ace Earthmoving was contracted by Latrobe City Council to construct a new concrete on steet carpark on Chapel Street in Morwell.

The new carpark consisted of:

Excavation of the existing site to the new design levels
Installation of 98m of 300 diameter reinforced concrete pipe
Construction of 4 1000 x 750 new drainage pits
Construction of crushed rock pavement 
Construction of 326m2 of 100mm concrete pavement with SL62 reinforcement
Construction of 143m of B profile monolithic kerb


Construction of 823m2 of 150mm concrete pavement with SL82 reinforcement
Application of linemarking 



Crinigan Road Concrete Road and Floodway, Morwell

Ace Earthmoving was contracted by Latrobe City Council to construct a new concrete Floodway and road on Crinigan Road in Morwell.

This project consisted of:

Excavation of the existing site to the new design levels
Installation of 2 2400 x 600 headwalls
Installation of 12 2400 x 600 box culvert crown units
Construction of 5 1000 x 750 new drainage pits
Construction of 1800 x 3000 x 1200 drainage pit
Construction of crushed rock pavement 

Construction of 2042m2 of 200mm concrete pavement with two layers of SL82 reinforcement
Construction of 170m of B profile monolithic kerb
Construction of 55m of M2 profile kerb
Application of linemarking ​​





Asclear Sandblasting Shed, Morwell
Ace Earthmoving was contracted by Asclear to construct a new concrete floor for there sandblasting shed in Morwell.

This project consisted of:

Excavation of the existing site to the new design levels
Construction of 960m2 of 150mm concrete pavement with one layer of SL82 reinforcement